Raised floors and building products[email protected]
MERO-TSK

MERO-TSK raised floors

MERO-TSK access floors from Germany, with Type 6 calcium sulphate panels and Type 2 systems for electrical rooms and other technical spaces.

Data centresControl roomsTechnical facilities
Ask about this product
MERO-TSK modular raised floor system

01 / MERO-TSK

MERO Type 2

The access floor construction type 2 has been designed in cooperation with electrical engineers and power station specialists. The construction has proved its worth in high, medium and low tension switchgears, battery rooms, control centres, emergency plants and is used in case of complicated bridging constructions as well as platform for fork-lift traffic.

Type 2 brochure (PDF, English)
Type 2-1200-600S — 10,000 N point load
Type 2-1200-600S — 10,000 N point load

02 / MERO-TSK

MERO Type 6

The access floor constructions of MERO type 6 mineral are suitable especially for the use in data processing centres, electric operating rooms, laboratories, production areas and power plants. Click here for brochure

MERO Type 6 calcium sulphate floor panel
MERO Type 6 calcium sulphate floor panel

MERO floor-system reference

Global Switch / Hong Kong

The Global Switch data center is located in the Tseung Kwan O Industrial Estate, which was developed by the Hong Kong Science and Technology Park to maintain Hong Kong’s position as the world’s leading business hub. Hong Kong’s largest operator and cloud-neutral data center with a first-class infrastructure area of 70,000 square meters.

The MERO raised floor system with calcium sulfate panels was selected to meet the MOB-PSA standard which is often specified in the Hong Kong market. For the first phase they reached the platinum level of the LEED certification. The operator is also working hard to achieve the Hong Kong Green Building Council recognized BEAM Plus new build gold level.

Global Switch Data Center, Hong Kong
Global Switch Data Center, Hong Kong

MERO floor-system reference

Digital Realty / United Kingdom

MERO products are ideal for the special requirements in data center construction. The calcium sulphate system type 6, for example, was selected for use in the following three UK data center projects: Canary Wharf in Central London, Slough in West London, and Crawley in South London.

Each of these projects includes data centers, associated corridors and technical rooms. A factory applied HPL (High Pressure Laminate) covering was selected for the demanding environment. In order to enable customers to have the best possible temperature control in the cold aisles, all three data centers were equipped with MERO Type 3 steel ventilation panels with which the cooling can be optimized. A total of approx. 12,000 m² MERO access floors were installed by MERO-trained fitters.

Digital Realty — installed raised-floor system
Digital Realty — installed raised-floor system

MERO construction-system reference

Jewel Changi / Singapore

MERO supplied the roof and façade structure for Jewel Changi Airport.

Now an iconic new structure of steel and glass, Jewel Changi Airport, will further enrich the terminal landscape. In line with Singapore’s reputation as a garden city, this extension of Changi Airport will house a five-storey forest valley and the world’s highest indoor waterfall, the “Rain Vortex”, which is breathtaking 40 m high.

MERO, with a long history of involvement in the various stages of expansion and refurbishment the terminals of Changi Airport have undergone so far has constructed the single layer roof and façade structure of Jewel as a unitized system of star nodes and square profiles.

Jewel Changi Airport — roof structure during construction
Jewel Changi Airport — roof structure during construction
About MERO-TSK +

MERO’s work also includes roofs, façades, aircraft docks and exhibition systems. The projects shown here are examples of the manufacturer’s work.

The MERO company started its activities in 1928, when Dr.-Ing. Dr. h.c. Max Mengeringhausen established the first building service engineering firm in Berlin, Germany. In 1948 he moved the company headquarters to Wurzburg.

From his idea to offer economic and innovative, customized solutions for the construction sector by using his industrially prefabricated elements he developed the “MEngeringhausen ROhrbauseise” (tube/node construction) in the late 1930’s.

In the meantime, MERO-TSK has been offering a wide range of construction elements, which are distributed not only as individual product lines but also as packages or part turn-key solutions. The philosophy of transferring natural laws into construction technology has continued to shape the aims and methods of the company implementing state-of-the-art technologies in design, manufacturing and construction.

Supported by modern technologies as regards to construction, production and management (according to ISO 9001) MERO-TSK has become one of the market-leaders in Germany and abroad.

During the tender and design stages, CAD animation facilitates planning. It allows the simulation of even the most extravagant shapes and highly sophisticated constructions.

Production halls totalling 37.000 sqm, equipped with laser welding machinery, welding robots, powder coating line etc, guarantee efficiency and high quality standard.

Construction Systems

Roofs and façades with all types of cladding/glazing including all necessary installations such as cleaning gantries, sunshades, façade heating systems etc.

Aircraft Dock and Hangars

Tailor-made concepts for the airline industry, worldwide delivery and installation of hangars and aircraft docks for maintenance and overhaul for all types of aircraft and helicopters.

Floor Systems

Economic and flexible access floor systems and cavity floors for office buildings and computer areas. Floor coverings, renovation as well as all maintenance services for the system floors.

Exhibit Systems

Modular system techniques for trade fair stands, exhibitions and decorative interior design solutions. Extensive accessory programm, fixing techniques, fillings and claddings. Graphic display systems. Individual custom-made solutions.

MERO products are of high quality standard which is assured by permanent internal and external quality control. MERO production, development and management are certified according to DIN EN ISO 9001.

Jewel Changi Airport — MERO building-envelope reference
Jewel Changi Airport — MERO building-envelope reference
Ferrari World, Abu Dhabi — MERO space-frame reference
Ferrari World, Abu Dhabi — MERO space-frame reference

MERO-TSK / INSTALLATION

Type 2 and Type 6 installation videos

MERO-TSK Type 2Installation guide
MERO-TSK Type 6Installation guide

CONTACT RAFINDO

Need help choosing a product?

Tell us what you’re planning, or ask us about a product or specification.

Contact our team